Affaire

Construction de sites miniers en Russie

The Fourth Geology Team of Liaoning Province, with the C1300 drilling rig, conducted construction in Khabarovsk, Russia in 2024. The hole was drilled at a 90-degree angle, and the final hole depth reached 580 meters.

share to:

sur Facebook
sur Twitter
sur LinkedIn
fr_FRFrench