geval

Mijnbouwplaats bouw in Rusland

The Fourth Geology Team of Liaoning Province, with the C1300 drilling rig, conducted construction in Khabarovsk, Russia in 2024. The hole was drilled at a 90-degree angle, and the final hole depth reached 580 meters.

share to:

op Facebook
op Twitter
op LinkedIn
nl_NLDutch