18 Years Factory Solar Panel Installation Rig - HDD Drill Rod & Pipe for Directional Drilling For Vermeer DitchWitch – TDS
18 Years Factory Solar Panel Installation Rig - HDD Drill Rod & Pipe for Directional Drilling For Vermeer DitchWitch – TDS Detail:
The raw materials selected by our company are all the alloy structure steels for geographical usage produced by Baogang Steel. After laboratory tests, both ends of a pipe are upsetted and proceeded to overall heat treatment, then friction welded. Before finished drill pipes are plated and packaged, a series of tests have to be implemented including hardness, metallurgical structure, physical performances, etc.

Compatible with Vermeer HDD Rigs
| Rig Compatibility* | Thread | Length | Pipe OD | Joint OD | Pin Length (mm) | Max. Torque (Nm) | |||
| mm | ft | mm | inch | mm | inch | ||||
| D7x11, D10x15 | #200 | 1,829 | 6 | 42 | 1.66 | 48 | 1.88 | 50.7 | 2,040 | 
| D20x22, D23x30 | #400 | 3,048 | 10 | 52 | 2.06 | 57 | 2.25 | 63.5 | 3,525 | 
| D24x40 | #600 | 3,048 | 10 | 60 | 2.38 | 67 | 2.63 | 63.5 | 5,695 | 
| D33x44, D36x50 | #650 | 3,048 | 10 | 60 | 2.38 | 70 | 2.75 | 63.5 | 6,800 | 
| D33x44, D36x50 | #650 | 4,572 | 15 | 60 | 2.38 | 70 | 2.75 | 63.5 | 6,800 | 
| D36x50, D40x55 | #700 | 3,048 | 10 | 67 | 2.63 | 79 | 3.1 | 76.2 | 7,457 | 
| D36x50, D40x55 | #700 | 4,572 | 15 | 67 | 2.63 | 79 | 3.1 | 76.2 | 7,457 | 
| D50x100, D60x90 | #900 | 3,048 | 10 | 73 | 2.88 | 83 | 3.25 | 88.9 | 12,202 | 
| D50x100, D60x90 | #900 | 4,572 | 15 | 73 | 2.88 | 83 | 3.25 | 88.9 | 12,202 | 
Compatible with Ditch Witch HDD Rigs
| Rig Compatibility* | Thread | Length | Pipe OD | Joint OD | Pin Length (mm) | Max. Torque (Nm) | |||
| mm | ft | mm | inch | mm | inch | ||||
| JT2720 | 1.94 | 3000 | 9.84 | 60 | 2.38 | 70 | 2.75 | 75 | 4340 | 
| JT20 | 1.94 | 3000 | 9.84 | 52 | 2.06 | 67 | 2.63 | 75 | 2980 | 
| JT2720M1, JT3020M1 | 2.11 | 3000 | 9.84 | 60 | 2.38 | 76.2 | 3 | 84.7 | 5420 | 
| JT25/30 | 2.11 | 3000 | 9.84 | 60 | 2.38 | 70 | 2.75 | 84.7 | 5420 | 
| JT4020 | 2.4 | 4500 | 14.76 | 73 | 2.88 | 82 | 3.23 | 99.5 | 6800 | 
| JT4020M1 | 2.59 | 4500 | 14.76 | 76 | 3 | 89 | 3.5 | 91.5 | 6800 | 
| JT7020M1, JT8020M1, JT100M1 | 3.27 | 4500 | 14.76 | 89 | 3.5 | 102 | 4 | 132.5 | 13,560 | 
Product detail pictures:
              
              
              Related Product Guide:
We have been experienced manufacturer. Wining the majority of your crucial certifications of its market for 18 Years Factory Solar Panel Installation Rig - HDD Drill Rod & Pipe for Directional Drilling For Vermeer DitchWitch – TDS , The product will supply to all over the world, such as: Angola, Mexico, Seychelles, We believe that good business relationships will lead to mutual benefits and improvement for both parties. We now have established long-term and successful cooperative relationships with many customers through their confidence in our customized services and integrity in doing business. We also enjoy a high reputation through our good performance. Better performance will be expected as our principle of integrity. Devotion and Steadiness will remain as ever.
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
Write your message here and send it to us
        





