The First Geological Exploration Institute of Qinghai Province used our C1800 drilling rig to conduct construction in Geermu, Qinghai Province in 2024. The characteristics of the mining area were high altitude and complex strata, with the depth of each borehole being over 1000 meters. At an altitude of 3500 meters, the vertical borehole had a depth of 1280 meters. Within an effective construction period of about 5 months, the total drilling depth was approximately 4000 meters.
