Caso

Construcción de sitios mineros en Rusia

The Fourth Geology Team of Liaoning Province, with the C1300 drilling rig, conducted construction in Khabarovsk, Russia in 2024. The hole was drilled at a 90-degree angle, and the final hole depth reached 580 meters.

share to:

de Facebook
Twitter
Inicio LinkedIn
es_ESSpanish