Affaire

Construction à grande altitude au Xinjiang, Chine

The Fourth Geology Team of the North China Geological Exploration Bureau conducted construction in Ru’gang, Xinjiang in 2024, using our C1300 drilling rig. The characteristics of the mining area were harsh environment, inconvenient transportation, uninhabited area, high altitude, hard rock core, and exploration of lithium minerals. The drilling hole was opened at 85 degrees, at an altitude of 4200 meters, and the final hole depth of the NQ drilling was 800 meters. Within the effective construction period of about 5 months, the total drilling depth was over 3500 meters.

share to:

sur Facebook
sur Twitter
sur LinkedIn
fr_FRFrench